Drawmer TS2 Especificaciones Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 14
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
Tube Station 2 OPERATORS’ MANUAL 3
Accessing the internal power switch and fuse
POWER CONNECTION
If the unit is required to operate at a mains input voltage which is different to that as
supplied:
The following procedure must be carried out by a qualified technical engineer.
1: Disconnect the unit from the mains.
2: Remove the twelve screws that retain the top cover.
3. Set the voltage rating and replace the fuse.
Mains Voltage 230V Fuse Value 160mA.
Mains Voltage 115V Fuse Value 315mA.
4. Replace the cover.
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 13 14

Comentarios a estos manuales

Sin comentarios